CÁDIZ BAY STREETCAR -TRAIN

In 2009, CAF was awarded the production of 7 tram-trains for the new Cadiz Tram-train system. This system consists of a total length of 24 km and will connect Chiclana, San Fernando and Cadiz. They are 55% low floor and consist of 3 modules each.

Other Projects

Technical data sheet

  • Composition Mc-T-Mc
  • Train length (mm): 38.140
  • Total passenger capacity 287 (8p/m2)
  • Maximum speed (km/h) 100
  • Equipment
    • Signalling: ASFA + CASE
    • Control and diagnosis system (MVB)
    • Analogue radio telephone
    • PIS + CCTV (front destination indicators + 4 interior cameras per car)
    • Communications equipment (train-earth transmission data)
    • Passenger counter