MONTERREY MM93 ARTICULATED UNIT

Between 2004 and 2005 CAF supplied 22 articulated train units to STC Metrorrey, Mexico. This Electric unit is made up of two intermediate cars which rest on three trucks, two of them motor trucks at each end and one carrying truck at the connection between both cars.

Other Projects

Technical data sheet

  • Composition Mc-Mc
  • Train length (mm): 29.560
  • Total passenger capacity 280 (6p/m2)
  • Maximum speed (km/h) 80
  • Equipment
    • Information central device
    • Automatic couplers
    • Equipment: Train positioning system